HomeServicesParking Lot Painting

Parking Lot Painting

A parking lot gets judged in the first three seconds of the drive-in. We lay out new lots and re-stripe faded ones, pulled to a string line and laser, sprayed in a single controlled pass, and reopened by morning.

About this service

The most visible maintenance a lot gets

Parking lot painting is the most visible maintenance a property gets. Faded, crooked or missing lines make a lot feel neglected, confuse drivers and cost you stalls. A fresh layout does the opposite: it maximizes the number of legal spaces, moves traffic in the right direction and tells customers the property is looked after.

We handle everything from a first-time layout on new asphalt to yearly re-stripes on busy retail lots. Layouts are chalked on site and confirmed with you before we spray, so the stall count, accessible stalls and fire lanes are right the first time.

Why it matters

What you get

  • More usable stalls from the same pavement
  • Clear direction for drivers and fewer near-misses
  • Accessible stalls and fire lanes that pass inspection
  • A lot that looks maintained from the street
What the job includes

What we do

  • New lot layout and design for the maximum legal stall count
  • Re-striping over faded or drifted lines
  • Directional arrows, stop bars, loading zones and crosswalks
  • Accessible stalls and access aisles laid out to code
  • Fast-cure waterborne traffic paint, dry to traffic in about an hour
In-house traffic control. Lots that open onto a live street or a busy entrance get our own traffic control, cones, signage and flaggers from the same crew.
Good for

Where it's used

Retail plazas and grocery lots

Apartments and HOA

Schools, clinics and offices

Dealerships and industrial yards

How it runs

From call to finished, in order

STEP 01

Survey and fixed quote

We walk the lot, measure the runs and send a marked-up plan with a fixed price, the same day.

STEP 02

Chalk layout and confirm

We chalk the layout on site and confirm stall counts, accessible stalls and flow before any paint goes down.

STEP 03

Blow clean, line, spray

Surfaces are blown clean, lines pulled to a string and laser, then sprayed in one controlled pass.

STEP 04

Cure and reopen

Dry to traffic in about an hour in good conditions. Before-and-after photos and the final count go on file.

Common questions

Good to know

How long is the lot closed?

Most re-stripes are a single overnight or weekend visit. Waterborne paint is dry to traffic in about an hour in good conditions, and we can stage in sections to keep part of the lot open.

How often should a lot be re-striped?

Every one to two years for busy commercial lots, sooner if lines are hard to see at night or in rain. We will tell you honestly when it is time.

Can you change the layout?

Yes. We can redesign for more stalls or better flow, and black out or remove the old lines so the new layout reads clean.

Ready to stripe the lot?

Send the address and what you need. Fixed quote back the same day.

Request a quote